PacifiCorp is seeking proposals for natural gas facilities necessary to provide natural gas transportation service to PacifiCorp's Dave Johnston Power Plant (DJ). The RFP covers the conversion of DJ from coal-fueled generation to natural gas, with service required in two phases: Phase I (April 1, 2028, 52,629 Dth/Day) and Phase II (April 1, 2029, additional 74,634 Dth/Day). PacifiCorp requires firm transportation service from a liquid natural gas supply hub to a new delivery point adjacent to DJ, which may require design, permitting, construction, and operation of a natural gas pipeline lateral and associated interconnect facilities and metering facilities. Proposals should include detailed information about Natural Gas Facilities (pipeline lateral routes, design parameters, right-of-way assessments, and schedules) and pricing information (cost estimates, transportation rates for various term options, and other applicable costs). PacifiCorp is also requesting proposals for primary firm transportation service from a major natural gas hub in the Rockies region to the interconnection point of the Natural Gas Facilities.